We moveyour cargo.
End-to-end management of logistics projects. We plan, coordinate and deliver every phase, from origin to destination.
A logistics project has many parts and passes through many hands. At ELEVA we organise the whole of it: we plan it, coordinate it and answer for it from start to finish.
Loading, transport, unloading and storage are the parts of that project, along with its permits and paperwork. We manage all of them through a single point of contact, or only the one you need.
The journey
The four operational phases of a logistics project. We take on one, several or the whole project.
-
Loading
We specify the lifting and handling equipment suited to the cargo, the access and the conditions of the operation.
Ask about loading only -
Transport
We plan the transport around the dimensions and weight of the load, the route and the delivery schedule.
Ask about transport only -

Unloading
We coordinate reception at destination: unloading equipment, crew and space ready before arrival.
Ask about unloading only -
Storage
We store and safeguard your cargo, by floor area or by volume, with scheduled inbound and outbound movements.
Ask about storage only
What you don’t see on the road
And the paperwork, too.
A project can be held up by a single document. We arrange permits and authorisations in advance so the operation meets its schedule.
Ask about documentationSpecial transport permits
We obtain the movement permits for loads that exceed the maximum dimensions or weights.
Customs management
We coordinate import and export clearance for the cargo.
Transport documentation
We prepare and check the documentation for every phase before the cargo moves.
The work in three verbs
Receive.
Store.
Dispatch.
When cargo arrives earlier than planned, we receive it, store it and prepare each dispatch to your schedule.
Ask about storage